VIVAQUA

Grootveldlaan

Construction of a rainwater basin (capacity +/- 8000 m³) by means of a tunnel drilling machine (segments) over a length of +/- 470 m without receiving well. A departure pit, an overflow that collects the sewage from the existing collector and 2 access shafts to the tunnel under the Grootveldlaan in 1150 Sint-Pieters-Woluwe

ANDERE PROJECTEN